Passa al contenuto

Battery / Pruning & maintenance training

Inizio
Fine
Aggiungi al calendario:

DURATION : 4 days / 28 hours

PRICE : €924 excl. VAT per person

TERMS

TECHNICAL

◢ Dedicated training room with video projector and screen.

◢ Workbenches + antistatic mats + tools + PELLENC-specific tools for each trainee.

◢ RFID and IRDA cards + charger test cables.

◢ Tools.

◢ Mechanical, electrical, and electronic parts.

◢ Computer with connection cables and specialized software.


TRAINING

◢ In-person training (groups of 5 to 8 trainees).

◢ Alternation between theory and practice (PPT presentation, study of instructional materials, participatory teaching methods, exercises, practical case studies, and hands-on work with equipment).

◢ Complete disassembly and reassembly of tools.


ASSESSMENT

◢ A knowledge assessment test will be administered at the beginning of the training.

◢ A final assessment will be administered at the end of the training.

◢ The instructor will conduct a live assessment of the various steps involved in disassembling and reassembly of the tools.


EQUIPMENT

◢ Participants must bring their own Personal Protective Equipment (PPE): safety shoes and pants, as well as a work laptop if they have one (for installing diagnostic software), an RS232/USB adapter (Ref. 61276) with cable, and RFID and IRDA detection cards.









Contact us to learn more 


DETAILS

TARGET AUDIENCE

Technician at an authorized PELLENC dealer.

This training is intended for anyone responsible for providing after-sales service for tools in the PARKS AND GARDENS line, as well as for any distributor wishing to repair the complete line of PELLENC batteries and the charging station.

Prerequisite : none.


EQUIPMENT

Helion Series (Helion 2, Helion T, Helion Alpha), Selion Series (M12, C21HD, Selion T), Prunion, Prunion-Perche, Cultivion, Excelion Alpha & C35/C45 + battery range.


OBJECTIVES

Understand how the tools work and make adjustments.

Disassemble and reassemble the tools.

Use the diagnostic software.

Identify the most commonly used battery technologies and identify the LITHIUM-ION technology used in PELLENC equipment.

Apply the basic rules for battery use, maintenance, and storage.

Diagnose and repair all PELLENC batteries.


SYLLABUS

OVERVIEW :

Pruning and maintenance

1. Introduction to the tools.

2. Study of the kinematics and operating principles of the tools.

3. Disassembly and reassembly of specific tool components.

4. Use of specialized tools.

5. Using the diagnostic software.


Batteries

1. Downloading battery data using a laptop.

2. Analyzing the downloaded files.

3. Diagnosing a battery.

4. Replacing and configuring an electronic circuit board.

5. Use of required antistatic equipment.

6. Learning how to solder with tin.


NAVIGATION :

1. Downloading technical documents.

2. Knowing how to use the online Documentation and Spare Parts Ordering site (PELLENC CATALOG) + site navigation.


CERTIFICATION

Certification and access to the control systems for the 250, Alpha 260-520, 750, and 1200-1500 battery electronic cards are contingent upon passing the final exam + charging station.


​